Current Systems

Primary Ventilation

  • VMC SF Auto-adjustable (post 1982)
  • Multiple extraction points
  • Window-mounted fresh air inlets
  • Automated flow regulation

Air Quality Concerns

  1. Radon Management

    • Level 3 Zone (High Potential)
    • Ground floor exposure
    • Basement areas
    • Required monitoring
  2. Moisture Control

    • Ventilated attic space
    • Building envelope
    • Humidity management
    • Condensation prevention

Maintenance Requirements

Regular Service

  1. VMC System

    • Filter cleaning/replacement
    • Duct inspection
    • Flow rate verification
    • Motor maintenance
  2. Air Quality Monitoring

    • Radon level testing
    • Humidity measurements
    • Air exchange rates
    • Temperature control

Improvement Needs

  1. Short-term

    • System cleaning
    • Flow optimization
    • Control calibration
    • Seal verification
  2. Long-term

    • System modernization
    • Additional extraction points
    • Smart controls integration
    • Performance monitoring