Current Performance

Energy Consumption

  • Overall Rating: 114 kWh EP/m²/year
  • GHG Emissions: 2 kg Ă©qCO2/m²/year
  • Annual Consumption:
    • Electricity: 15,971 kWh EF
    • Wood: 50,400 kWh EF
    • Total Primary Energy: 91,604 kWh EP

System Efficiency

  1. Primary Heating

    • Wood Boiler (Class 5)
    • High efficiency rating
    • Programmable control
    • Renewable energy source
  2. Secondary Heating

    • Electric convectors with programmer
    • Radiant panels with programmer
    • Zone-specific control
    • Supplementary usage

Building Components

Thermal Performance

  1. Walls

    • 50 cm cut stone construction
    • No current insulation
    • External exposure
    • Improvement potential
  2. Roof/Ceiling

    • Uninsulated ceiling
    • Ventilated attic space
    • Heat loss concern
    • Upgrade priority
  3. Windows

    • Mixed glazing types:
      • PVC double glazing (14mm air gap)
      • Wood single glazing
      • Metal frame double glazing (12mm air gap)
  4. Foundation

    • Uninsulated concrete slab
    • On-grade construction
    • Heat loss through floor
    • Moisture considerations

Improvement Opportunities

Short-term Optimization

  • System balancing
  • Control optimization
  • User training
  • Maintenance optimization

Long-term Upgrades

  1. Insulation Projects

    • Ceiling/attic priority
    • Wall assessment
    • Floor possibilities
    • Window replacements
  2. System Modernization

    • Distribution optimization
    • Control integration
    • Monitoring implementation
    • Efficiency tracking

Renewable Energy

  • Current Contribution: 63.0 kWh EP/m²/year from wood heating
  • Potential for expansion
  • Integration opportunities