Hazardous Materials Management

Asbestos

  1. Identified Locations

    • Ground Floor Room 2: Fiber cement conduit (AC1)
    • Garage: Multiple fiber cement conduits (EP)
    • Storage Room 2: Two fiber cement conduits (EP)
    • Exterior: Four pillars with fiber cement components (EP)
  2. Monitoring Requirements

    • Visual assessment every 6 months
    • Professional evaluation every 3 years
    • Documentation and photo records
    • Access control protocols

Lead Paint

  1. Survey Results

    • Total Units Tested: 1,013
    • Class 2 (Stable lead): 148 units (14.6%)
    • Class 0 (No lead): 625 units (61.7%)
    • Not tested: 240 units (23.7%)
  2. Management Protocol

    • Regular condition monitoring
    • Professional assessment schedule
    • Documentation requirements
    • Worker safety protocols

Natural Risk Management

Seismic Considerations

  1. Zone Classification: 3 (Moderate)

    • Structural assessment needs
    • Reinforcement requirements
    • Emergency protocols
    • Regular inspections
  2. Radon Management

    • Category: Level 3 (High Potential)
    • Ventilation requirements
    • Testing schedule
    • Mitigation measures

Emergency Systems

Fire Safety

  1. Required Equipment

    • Fire detection systems
    • Emergency lighting
    • Evacuation signage
    • Fire extinguishers
  2. Access Control

    • Security systems
    • Emergency exits
    • Access restrictions
    • Key management

Safety Documentation

Required Records

  1. Inspection Reports

    • Asbestos monitoring
    • Lead paint assessment
    • Fire safety checks
    • Structural evaluations
  2. Emergency Procedures

    • Evacuation plans
    • Emergency contacts
    • First response protocols
    • Staff training records